Lower Kalnai Hydro Electric Project (2 x 24) MW
|
|
Location |
: |
Thathri, Jammu & Kashmir |
Client |
: |
Jammu & Kashmir SPDCL |
Value of Work |
: |
Rs. 3960.00 Millions |
Scope |
|
|
Planning, Design & Engineering and
execution of Civil & Infrastructure Works; manufacturing, fabrication,
assembling, testing, inspection, transportation, supply, erection, supervision,
testing and commissioning of Electro Mechanical and Hydro Mechanical
equipment’s for 2x24MW Hydro-electric Power Project. Project involves
Construction of 3960 meter long and 4.7 meter diameter tunnel & 60 meter
high concrete dam.
|
|
Rangit Hydro Electric Project-II (66MW)
|
|
Location |
: |
Sikkim |
Client |
: |
Sikkim Hydro Power Ventures Limited |
Value of Work |
: |
Rs. 2203.50 Millions |
Scope |
|
|
Power House Complex, Tail Race and
Appurtenant Works. Pressure
Shaft/Tunnel, Portal Excavation and Appurtenant Works.
Surge
Shaft, and Appurtenant Works.
Head
Race Tunnel (4737 meters), Construction Adits.
|
|
Parbathi Hydro Electric Project – Stage – II
|
|
Location |
: |
Kullu (Himachal Pradesh) |
Client |
: |
National Hydroelectric Power Corporation Limited |
Value of Work |
: |
Rs. 783.40 Millions |
Scope |
|
|
Construction of 4m
Dia tunnel of 5331m length, drop shafts, weirs and connecting roads.
|
|
Hydro Electric Project Stage-IV (3 x 40MW)
|
|
Location |
: |
West Sikkim |
Client |
: |
Jal Power Corporation Ltd. |
Value of Work |
: |
Rs. 3400.00 Millions |
Scope |
|
|
Construction of 44m High Concrete Gravity
Dam, 3 No’s -130m Long underground
de-silting Chambers and 3 No’s Intake including Adits, Temporary diversion of
river Rangit, Excavation and Concreting of Dam, Open and underground excavation
and Concreting of Intake, Intake Tunnels and Associated Activities.
Construction of 6.4m diameter, 6338m long Head Race Tunnel (HRT) including Adits, Underground Excavation with Structural Steel Support , Concrete
Lining Works in tunnel , grouting works,
Instrumentation, dewatering and other associated Activities.
|
|
Teesta Hydro Electric Power Project – Stage III
|
|
Location |
: |
Sikkim |
Client |
: |
Abir Constructions Pvt. Ltd. |
Value of Work |
: |
Rs. 1700.00 Millions |
Scope |
|
|
Construction of Civil
Works for underground Power House and Associated Works / Main Access Tunnel
(MAT), Cable Tunnel, Tail Race Tunnel including Transformer Cavern associated
Construction Tunnels and Associated works for 1200MW Hydro Power Project |
|
Thottiyar Hydro Electric Project ( 1 x 30 + 10MW)
|
|
Location |
: |
Thiruvananthapuram (Kerala) |
Client |
: |
Kerala State Electricity Board |
Value of Work |
: |
Rs. 1440.00 Millions |
Scope |
|
|
Design & Construction of Diversion
Weir, Approach Channel, Intake Structure, Head race tunnel, penstock, Power
House, Switch Yard, Tailrace Channel, Bridge and Access Roads and all other
Civil Works.
|
|
Bangalore Metro Rail Project-Phase - I
|
|
Location |
: |
Bangalore (Karnataka) |
Client |
: |
Bangalore Metro Rail Corporation Ltd. |
Value of Work |
: |
Rs.7075.00 Millions |
Scope |
|
|
Design and construct contract of 5062 meters. Underground Stations and Tunnels
along North-South Corridor (Excluding Majestic Station) for Bangalore
Metro Rail Project-Phase-I.
|
|
BMRCL - COASTAL-GYT (JV)
|
|
Location |
: |
Bangalore (Karnataka) |
Client |
: |
Bangalore Metro Rail Corporation Ltd. |
Value of Work |
: |
Rs. 2719.40 Millions |
Scope |
|
|
Design and construct contract of
Underground Majestic Station (Interchange Station) for Bangalore Metro Rail
Project-Phase-I involving 92014 m 3 of Concrete and 17775 MT of Steel.
|
|
Pula SubbaiahVeligonda Project – Tunnel-1
|
|
Location |
: |
Srisailam (Andhra Pradesh) |
Client |
: |
Sabir, SEW & Prasad (JV). |
Value of Work |
: |
Rs. 3125.00 Millions |
Scope |
|
|
Construction of Tunnel from Kollamvagu in the foreshore of Srisailam
reservoir up to Guntur to Kurnool including construction of Head Regulator, Approaches, Approach
Channel, Exit Channel Etc Of Dia 7Mts. And length 18820 meters. With Horse Shoe
Shape.
|
|
Pula SubbaiahVeligonda Project – Tunnel- 2
|
|
Location |
: |
Dornala - Srisailam (Andhra Pradesh) |
Client |
: |
Irrigation & CAD Department - Govt of Andhra Pradesh |
Value of Work |
: |
Rs. 7352.10 Millions |
Scope |
|
|
Investigation, Design and Execution and
Construction of 18838 meters 2nd Tunnel with 9.2 M internal dia for Pula
Subbiah Veligonda Project - Tunnel 2
using Double Shield Tunnel Boring Machine i.e. from Kollam Vagu in the
foreshore of Srisailam Reservior up to Guntur-Kurnool Road to join into the
Feeder Canal, Approaches, Approach Channel, exit channel and obtaining
necessary permissions from Government . of
India.
|
|
Sleemnabad Carrier Canal (Bargi Right Bank Canal)
|
|
Location |
: |
Katni (Madya Pradesh) |
Client |
: |
Patel-SEW (JV) |
Value of Work |
: |
Rs. 7200.00 Millions |
Scope |
|
|
Execution of the Sleemnabad Carrier Canal
(Bargi Right Bank Canal) for Bargi Diversion Project from R.D. 104 Km. to R.D.
129 Km. on TURNEYKEY Basis comprising the work of Survey, Planning,
Geotechnical Investigation, Design, Estimation, Preparation of Permanent Land
Acquisition Cases, Construction of Lined Tunnel (12000 meters in length, 10 m.
diameter) with cut and cover RCC transitions (900 M. Length),
Construction of Canal (13 Km. In
length) by Excavation, Cement Concrete lining, all inline structures and
commissioning and testing of the canal
system.
|
|
AVR-HNSS Main Canal – Phase – II
|
|
Location |
: |
Anantapur (Andhra Pradesh) |
Client |
: |
Irrigation & CAD Department - Govt of Andhra Pradesh |
Value of Work |
: |
Rs. 1351.00 Millions |
Scope |
|
|
Scope:
Package - 6
Excavation and Construction of Tunnel Dia – 7.50 Mtrs. including lining
of HNSS Main Canal
from Km.285.100 to Km.287.100 under phase – II duly providing approaches 150
Mtrs. both sides – 2000 meters.
Package - 10
Excavation and Construction of Tunnel Dia – 6.60 Mtrs., including lining
on HNSS Main Canal
from Km.358.500 under Phase - II duly providing approaches 150 Mtrs. both sides
–2100 meters.
Package - 15
Excavation and Construction of Tunnel Dia – 5.20 Mtrs. including lining
on HNSS Main Canal
from Km.412.000 to Km.415.000 under Phase - II duly providing approaches 150
Mtrs. both sides –3000 meters.
Package - 20
Excavation and Construction of Tunnel Dia – 4.96 Mtrs. including lining
on HNSS Main Canal
from Km.506.000 to Km.511.000 under Phase - II duly providing approaches 150
Mtrs. both sides –5100 meters. |
|
Garudeshwar Weir
|
|
Location |
: |
Garudeshwar, Gujarat. |
Client |
: |
M/s. RithwikProjectsPvt. Ltd |
Value of Work |
: |
Rs. 2994.3 Millions |
Scope |
|
|
Construction of
Garudeshwar Weir includes Spillway, Non Over Flow Blocks, Rock fill Dam,
Approach channel and Design Engineering, Procurement and construction of Hydro
Mechanical Works Across River Narmada involving 800,000 m3 of Concrete |
|
JCR-Devadula Lift Irrigation Scheme-Phase-III-Package-III
|
|
Location |
: |
Warangal (Andhra Pradesh) |
Client |
: |
Hindustan Construction Company Ltd |
Value of Work |
: |
Rs. 9058.50 Millions |
Scope |
|
|
Investigation Design and
Execution of Tunnel of 54880, 5.60 M in ‘D’ shaped with carrying capacity of
49.60 Cumecs water from RamappaTank to Dharmasagar Tank and construction of
Head Regulator at the entry portal of Tunnel including Civil,
Electro-Mechanical & Hydro Mechanical, Instrumentation, and SCADA system at
pumping station in Warangal District of Andhra Pradesh.
|
|
Nellore Barrage-Package-6
|
|
Location |
: |
Nellore (Andhra Pradesh) |
Client |
: |
Irrigation & CAD Department - Govt of Andhra Pradesh. |
Value of Work |
: |
Rs. 1267.00 Millions |
Scope |
|
|
Investigation, Design, Drawing, Estimation and Construction of Barrage –
Cum-Bridge across Pennar
River.
Fabrication of gates & electrically operated Hoist bridge
arrangements and other related works.
|
|
Pranahita-Chevella Lift Irrigation Scheme -Link-IV-Package-10
|
|
Location |
: |
Ellanthakunta, Karim Nagar (Telangana) |
Client |
: |
Hindustan Construction Company Ltd. |
Value of Work |
: |
Rs. 1970.00 Millions |
Scope |
|
|
Excavation and Construction of Tunnel Dia –
9.50Mtrs. and 7.465kms length, including lining and construction of Surge Pool
Adit.
|
|
SLBC -A.M.R.Project-Tunnel-2
|
|
Location |
: |
Devarakonda (Andhra Pradesh) |
Client |
: |
Jayaprakash Associated Ltd. |
Value of Work |
: |
Rs. 1310.20 Millions |
Scope |
|
|
Excavation and Construction of Tunnel Dia – 8.75 Mtrs and 7.230 kms
length. in complete shape including lining duly providing approaches 150 Mtrs.
|
|
Jhanjra Longwall Project
|
|
Location |
: |
Jhanjra |
Client |
: |
M/s. Eastern Coal fields Limited |
Value of Work |
: |
Rs. 2240 Millions |
Scope |
|
|
Scientific Site investigation and study for
introduction of Powered Support Longwall Technology
Provision of services for extraction 9.4 MT of coal by Powered Support
Longwall Technology for six years
|
|
Indo-Bangladesh Border Fencing Project (IBBF)
|
|
Location |
: |
Meghalaya & Tripura |
Client |
: |
M/s. National Buildings Construction Corporation Ltd |
Value of Work |
: |
Rs. 1498.00 Millions |
Scope |
|
|
Construction of Indo-Bangladesh Border Road,
Fencing, in the state of Meghalaya & Tripura. |
|
New Railway Line Project –Jiribam - Tupul
|
|
Location |
: |
Imphal (Manipur) |
Client |
: |
NF Railway, Mallgaon |
Value of Work |
: |
Rs. 13232.48 Millions |
Scope |
|
|
Construction of 24.00
Km Single line Tunnels at various points km 15.880 to km 73.900 in between
Dholakal and Tupul in connection with construction of New Railway Line Project Jiribam -Tupul
(Imphal) of N.F. Railway |
|
Coal Handling Plant & Ash Handling Plant for 2 X 520MW TPP
|
|
Location |
: |
Vishakhapatnam (Andhra Pradesh) |
Client |
: |
Bharat Heavy Electricals Limited. |
Value of Work |
: |
Rs. 1274.87 Millions |
Scope |
|
|
Piling, Civil,
Structural and architectural work Coal Handling Plant & Ash Handling Plant for
(2 X 520) MW TPP |
|
Establishment of Substation at Mallat
|
|
Location |
: |
Manvi, Raichur (Karnataka) |
Client |
: |
Karnataka Power transmission Corporation Limited |
Value of Work |
: |
Rs. 409.37 Millions |
Scope |
|
|
Civil Works for establishment of 2 X 100
MVA, 220/120 KV and 1 X 10MVA, 110/11KV substation at mallat in manvi taluk,
Raichur District by construction of 220KV LILO line from RTPS-Lingasugar SC
line to the proposed 220/110 KV Mallat Sub station for a distance of 2.80 Kms
long with construction of terminal bays at existing 110/33/11KV kavital SS
& 110/11KV Byagwat SS and 110KV
SC/DC evacuation lines.
|
|
|